Config15 23-Apr-2018 to present This is rebuilt S/N 1 with a new PDBS and fold mirror. It was received at NIST around April 19. Mark says "This part is one of the two original test parts (Rev C, SN1 & SN2) we made as opposed to the large run of "production" units (Rev D).(which are numbered (D001-DXXX)). These two Rev C test splitters have a slightly different tolerance on the barrel ID to allow adequate adjustment and I consider them incompatible with the Rev D production parts." I had saved the lenses from S/N 1 when I sent it back to Mark for realignment. So this configuration is: Input: Lens "1 2" from S/N 1 with Fiber Collet at the BS body and FC at the sphere source, fiber is same as Config13; Through output: Lens "Vis 3 4" from S/N 1 with Fiber Collet at the BS body and FC at PD2, fiber is same as Config13; 90deg/fold output: Lens "NIR" from S/N 1 with FC at BS and FC at PD1, fiber is FISH #7. Gains / which PD 6 / source sphere 7 / through channel (PD2) 8 / 90deg/fold channel (PD1) To assemble, everything was disconnected (output PDs and connectors on the sphere source) so not to perturb the collets, which cannot be twisted.