CRUISE | DATES | LOCATION |
MOCE-8 | 28-Feb-2001 - 09-Mar-2001 | Lanai |
Description: MOBY and Mooring swap-out cruise via R/V K.O.K.: both MOBY215 and the deep-sea Mooring were recovered on the 28th during leg #1 of the cruise. Before returning to Snug Harbor on March 1st, the new mooring was deployed with the assistance of Mooring Systems Inc (MSI) personnel. The new moorings witness buoy incorporates the updated MOBY Meteorological and Oceanographic Buoy (MMOB1) MOBY216 was deployed during Leg #2 on 04 March. Two sets of initial diver-reference measurements were made on the 8th with the assistance of HRA. |