MOBY Photo Album - 200410_Turbid-9

CRUISE DATES LOCATION
Turbid-9 30-Sep-2004 - 13-Oct-2004 Chesapeake Bay
Description: 30 September to 13 October 2004 Chesapeake Bay Bio-optical Cruises: The R/V Lady Bug was used for daily cruises that departed and returned to Ferry Point harbor. Setup aboard the boat started on 21 September and ended on 29 September. Precruise irradiance and wavelength radiometric calibrations were performed on 27 September and radiance calibrations on 29 September. Steve Brown operated the new NIST Ship-Board Calibrator (SBC) during tests with MOS and FOS aboard the Lady Bug on 29 September. The SBC was left for the duration of the cruise for further inspection and testing. Thirty two oceanographic stations were occupied between 30 September and 13 October during SeaWiFS, Aqua, Terra and EO1 satellite overpasses.

200410_Turbid-9


PA040001

PA040002

PA040003

PA040004

PA040005

PA040006

PA040007

PA040008

PA040009

PA120010

PA120011

PA120012

PA120013

PA120014

Stephanie Flora - Moss Landing Marine Laboratories