MOBY Photo Album - 20080612_MOBY-L158

CRUISE DATES LOCATION
MOBY-L158 12-Jun-2008 - 13-Jun-2008 Lanai
Description: MOBY Maintenance Cruise: On 12 June MOBY240 before-cleaning diver calibration scans were completed and underwater photographs were taken. On 13 June MOBY240 sensors were cleaned, and Linux disc maintenance was performed.
Details: I visited the MOBY site on 12 and 13 June 2008 with Steve and Tyler from HRA. We found the buoy to be exceptionally clean and in good condition. On the 12th we took pictures and performed "dirty" cals, 2 Lu sets and 1 Ed set (the second Ed battery was bad). The winds were quite strong on the 13th, in the 20 knot range, even though the forecast was for variable winds, so we were only able to do the cleaning and reinstall the anti-fouling tubes. I arranged with Marco to connect via Internet to the MOBY Linux controller to check disk space and collect some of the saved diagnostic information. Marco had some concern that the Linux system could be filling the disk more rapidly than predicted and wanted to connect to check the system as a precaution. I was at the MOBY site on the 13th, right after his session, to make sure the controller continued to cycle properly after he disconnected or to restart the system if he had a problem. There were no problems, the system functioned properly and the Linux system has plenty of space for the entire deployment.

Mark

20080612_MOBY-L158


_DSC0001

_DSC0002

_DSC0003

_DSC0004

_DSC0005

_DSC0006

_DSC0007

_DSC0008

_DSC0009

_DSC0010

_DSC0011

_DSC0012

_DSC0013

_DSC0014

_DSC0015

_DSC0016

_DSC0017

_DSC0018

_DSC0019

_DSC0020

Stephanie Flora - Moss Landing Marine Laboratories