MOBY Photo Album - 20100930_MOBY-L186

CRUISE DATES LOCATION
MOBY-L186 30-Sep-2010 - 02-Oct-2010 Lanai
Description: MOBY-L186: 30 September to 02 October 2010 MOBY Maintenance Cruise: On 30 September, MOBY246 tether was replaced, the top arm was straightened and top arm white wire was reconnected. On 01 October, MOBY246 diver inspection and underwater photographs were taken along with before cleaning diver calibrations and the bird spikes were straightened out of the Es sensor field of view. On 02 October, MOBY246 sensors were cleaned and the anti-fouling tubes were re-charged.