CRUISE | DATES | LOCATION |
MOBY-L287 | 27-Nov-2019 - 27-Nov-2019 | Lanai |
Description: MOBY-L287: 27 Nov-2019 MOBY Maintenance Cruise: We discovered the top arm missing, sheared off at the base of the upper arm support. There was not much to do once the missing arm was verified. No obvious sign of boat damage. | ||
Details: |