The BS/RS collector heads were removed from M267 on Sat 30-Nov & Sun 01-Dec-2019.
MOBY267 was rotated on Monday, 02-Dec-2019,
and the BS+RS+Splitter was removed from the buoy.
During rotation water was observed dripping off MOBY near the Mux.
The water-tight-fitting at the Mux on the Es fiber was found to be loose.
The Mux cover was removed - the Mux was flooded.
There are some photos of the condition of the Mux before/after opening
filenames 2019120201 ... 14*.jpg, at
/ftp1/Mike/L285/photos/M267_post-cal-MOS/
Later on Monday Terry rinsed out the Mux @ FO connectors.
Tuesday 03-Dec-219 the BS/RS/Splitter rails were shortened on MOBY
filenames 2019120301 ... 10*.jpg
Tuesday evening I tried to take a complete set of photos of Mux FO ports
filenames 2019120311 ... 51*.jpg
Today, Wednesday 04-Dec-2019, FOs at the Mux may be removed.
The MOS FOs were disconnected for the Mux today.
The Es fiber will need re-termination because the nut on the SMA
at the Mux end was no longer usable. There are photos of the
Mux-end FO tips, filenames 2019120401 ... 12*.jpg at