MOBYrefresh - RS01 Configurations


MOBY-Refresh will have 4 each blue and red specs - BS01, BS02, BS03, BS04 and RS01, RS02, RS03, RS04
Group
Exp#
configLinkDescription

Date Added

Intial Resonon 1 1.001 001 white light 2dec2015 email: White light source from email from Mike with first test images 12/3/2015
Intial Resonon 1 1.002 001 helium 2dec2015 email: Helium source from email from Mike with first test images 12/3/2015
Intial Resonon 1.003 001 darks 4dec2015_email: Darks at 0.1 sec second set of data (this dark file is used for all image below) 12/4/2015
Intial Resonon 1.004 001 allfibers_radiance 4dec2015_email: All fibers looking at a integrating sphere at 0.1 sec 12/4/2015
Intial Resonon 1.005 001 channel8_radiance 4dec2015_email: channel 8's fiber looking at a integrating sphere at 0.1 sec 12/4/2015
Intial Resonon 1.006 001 helium 4dec2015_email: All fibers looking at a helium lamp at 0.1 sec 12/4/2015
Intial Resonon

1.007

001 sys resp 4dec2015_email: System response (calced by Resonon and SFlora) 12/4/2015
Intial Resonon 1.008 001 rsg w/ blue bundle 7jan2016_email: RS but with the blue spec fiber bundle: All fibers looking at a integrating sphere 1/8/2015
Intial Resonon 1.009 001 img_comp 7jan2016_email: RS but with the blue spec fiber bundle: comparison of images 1/8/2015
Intial Resonon 1.010 pre_delivery PDF 1apr2016_email: Pre-Delivery Resonon Test Report 4/6/2016
Intial Resonon

1.011

001 darks 1apr2016_email: Darks at 0.1 sec second set of data (this dark file is used for all image below) 4/7/2016
Intial Resonon 1.012 001 allfibers_radiance 1apr2016_email: All fibers looking at a integrating sphere at 0.1 sec 4/7/2016
Intial Resonon 1.013 001 channel8_radiance 1apr2016_email: channel 8's fiber looking at a integrating sphere at 0.1 sec 4/7/2016
Intial Resonon 1.014 001 helium 1apr2016_email: All fibers looking at a helium lamp at 0.1 sec 4/7/2016
Arrived in Hawaii on 11 Apr 2016
Hawaii-2016-03 2.01 001 webpage Hawaii-2016-03 - Oriel lamp, laser and solar intial checks 5/9/2016
Hawaii-2016-07 2.02 001 webpage Hawaii-2016-07 - predeployment data software testing 9/9/2016
MOBY-L267 2.03 001 webpage MOBY-L267 - testing before possible deployment in MOBY265 2/5/2018
RS01's camera was sent back to Andor have wedged window installed then to Resonon for re-alignment and they arrived in HI in good shape on 23-Aug-2019
Exp
Exp#
Config link Description - Aug 2019 data set after wedge window repair

Date Added

2nd Resonon 11.01 pre_delivery PDF Pre-Delivery 2Resonon Test Report 10/21/2019
2nd Resonon 11.02 inital allfibers_sphere All fibers looking at a integrating sphere 10/21/2019
2nd Resonon 11.03 inital channel7_sphere channel 7's fiber looking at a integrating sphere 10/21/2019
2nd Resonon 11.04 inital helium All fibers looking at a helium lamp 10/21/2019
           
           
           


System configuration documents etc
Link Description Date
Photos of RS1 system on arrival in Hawaii Mikes photos of the new RS1cfg001 system upon arrival in Hawaii 11 Apr 2016
Performance doc for the Andor camera Andor Camera performance doc -DU934P-BR-DD (SN: CCD-17879) - RS01cfg001 14 Apr 2016